Procedure: Selection through a public invitation for selecting a contractor for the “Construction of a photovoltaic installation with an output AC power of 200 kW for the production of energy from renewable sources for own consumption at the commercial facility and office of “Bultex 99” Ltd., combined with local energy storage facilities (batteries)” Plovdiv, April...
Published procedure for “Construction of new photovoltaic systems for self-consumption combined with batteries,” funded by the European Union – NextGenerationEU.


Procedure: Selection through a public invitation for selecting a contractor for the “Construction of a photovoltaic installation with an output AC power of 200 kW for the production of energy from renewable sources for own consumption at the commercial facility and office of “Bultex 99” Ltd., combined with local energy storage facilities (batteries)”
Plovdiv, April 17, 2025. “Bultex 99” Ltd. announces a procedure for selection through a public invitation for selecting a contractor for the “Construction of a photovoltaic installation with an output AC power of 200 kW for the production of energy from renewable sources for own consumption at the commercial facility and office of “Bultex 99” Ltd., combined with local energy storage facilities (batteries).” The procedure is being implemented under an Administrative Contract for Granting Non-Repayable Financial Assistance under procedure BG-RRP-3.006, “Construction of new RES facilities for own consumption combined with local energy storage facilities in enterprises,” as part of the “Economic Transformation Programme” investment under the “Smart Industry” component of the National Recovery and Resilience Plan.
Potential contractors will be required to carry out the following sub-activities:
- Construction of a photovoltaic installation /construction and installation works/ with a total capacity of 172.8 kWp for the production of energy from renewable sources for own consumption at the commercial facility and office of “Bultex 99” Ltd., combined with local energy storage facilities (batteries) with a capacity of 214 kWh.
- The photovoltaic system must be installed on the roof structure of existing buildings in Regulated Land Plot 97, locality 224, Trud village, Plovdiv region;
- Consulting services of an engineering and technical nature.
The complete documentation package has been published in the ISUN 2020 system – https://eumis2020.government.bg/bg/641f4b36/Offers/Details/4ea741bd-47d5-4744-966f-128d81f671c0
The deadline for submitting offers is April 24, 2025.




